Downtown Dubai · Bathroom renovation
Bathroom renovation

Residential · Dubai
Improve the layout, storage and finish of your bathroom with the technical details considered from the start.
Ideas for your brief
A closer look at bathroom renovation
Use the gallery to identify details you want to discuss for your own property.
Explore the design gallery
Halo Interiors portfolio
Project examples
Halo Interiors · Our parent company
Our Trusted Partners
Bathroom renovation
What the work can include
We bring bathroom fittings, surfaces and made-to-measure vanities into an agreed renovation package. Plumbing, electrical and waterproofing specialists are appointed to suit the requirements, with checks planned at the relevant stages.
Layout & fittings
The arrangement of fittings and storage reviewed against the existing room and your priorities.
Surfaces & joinery
Tile, stone, selected finishes and vanities connected through approved selections and drawings.
Specialist interfaces
Service routes and relevant waterproofing work reviewed before finishes conceal the installation.
Existing conditions, specialist testing and exclusions are established for the property before the work is confirmed.
What you can expect
A clear scope
Inclusions, exclusions and specialist responsibilities agreed before commitment.
The right specialists
Designers, engineers, manufacturers and contractors appointed around the work.
Visible progress
Agreed updates, recorded decisions and changes confirmed in writing.
A documented handover
Inspections, snag closure, care guidance and relevant warranty information.
How it works
From your brief to handover.
- 01
Discover
We listen to your priorities, location, budget expectations and target date.
- 02
Define
We review the site and establish the scope and specialist requirements.
- 03
Agree
A clear proposal brings scope, cost and programme together.
- 04
Deliver
Drawings and selections become coordinated work on site.
- 05
Refine
We inspect, test and work through the finishing details.
- 06
Handover
A considered finish, with the information you need next.
Decide early Agree drainage falls, waterproofing interfaces and access to concealed valves before tiling.
Quotation & programme
Cost of bathroom renovation in Dubai
Halo Works project budget range
AED 100,000 to under AED 300,000Drain positions, waterproofing preparation, tile format, sanitaryware and custom vanities affect the scope. Allow time for the required checks before covering wet-area work.
Your proposal sets out inclusions, exclusions, payment milestones and programme assumptions. Tell us your target date so we can account for access, approvals and lead times.
Read the cost guideWhat a clear brief makes possible
Resolve the wet-area details early
Plan the shower, vanity and storage together so drainage, clearances and maintenance access work with the chosen finishes.
What to send us
Send the property location, photos or drawings, what you want to change and your target date. Include an indicative budget if you have one.
Prepare your briefCan I replace a bath with a walk-in shower?
The drain position, available floor depth and waterproofing details need to be checked. Those constraints inform the shower layout and threshold.
Who carries out the specialist work?
We appoint designers, engineers, manufacturers and contractors as required for the agreed work. Your proposal records who is responsible for each package.
What should I share for a quotation?
Share the property location, photos or drawings, your priorities and required completion date. An indicative budget helps us assess options.
Will my project need approval?
That depends on the property and the proposed work. We establish the requirements with the appointed specialists and agree who will submit the information.
What happens at handover?
We inspect the agreed work, record and follow up outstanding items, and compile the applicable test records, care information and warranty details.
Planning your project
Related guides
RenovationWhat to check before your bathroom gets tiled
Agree how drainage, waterproofing and concealed fittings will be checked while you can still see them.
Read guide
RenovationNew kitchen or new cabinet fronts? How to decide
Check the cabinet boxes, layout and appliances before paying for a full kitchen replacement.
Read guide
MaterialsCan you put new flooring over old tiles?
Check the old floor, door clearance and the installation instructions before choosing an overlay.
Read guideProject enquiries
Discuss your project.
Tell us what you want to change and when it needs to be ready. We’ll review your brief and discuss the next steps.
Chat on WhatsApp [email protected]












