Almas Tower, Jumeirah Lakes Towers · Office fit-out
Interior fit-out

Fit-out · Dubai
Prepare an empty or existing space for the way you need it to work. We manage the fit-out scope, specialist appointments, procurement and site delivery.
Ideas for your brief
A closer look at interior fit-out
Use the gallery to identify details you want to discuss for your own property.
Explore the design gallery
Halo Interiors portfolio
Project examples
Halo Interiors · Our parent company
Our Trusted Partners
Interior fit-out
What the work can include
We establish what can be retained, what needs to change and which work packages must fit together. Approved drawings, finishes and technical requirements guide the sequence through installation and handover.
Layout & building works
Review strip-out, reconfiguration, partitions, ceilings and interfaces with the existing property.
Joinery & finishes
Agree shop drawings, samples and specifications for cabinetry, flooring, wall finishes and other interior elements.
Specialist packages
Bring in the required electrical, plumbing, HVAC, glazing and other specialists. Agree their responsibilities and checks before work begins.
Access, the required approvals and the appointed submitting party are confirmed for each property.
What you can expect
A clear scope
Inclusions, exclusions and specialist responsibilities agreed before commitment.
The right specialists
Designers, engineers, manufacturers and contractors appointed around the work.
Visible progress
Agreed updates, recorded decisions and changes confirmed in writing.
A documented handover
Inspections, snag closure, care guidance and relevant warranty information.
How it works
From your brief to handover.
- 01
Discover
We listen to your priorities, location, budget expectations and target date.
- 02
Define
We review the site and establish the scope and specialist requirements.
- 03
Agree
A clear proposal brings scope, cost and programme together.
- 04
Deliver
Drawings and selections become coordinated work on site.
- 05
Refine
We inspect, test and work through the finishing details.
- 06
Handover
A considered finish, with the information you need next.
Decide early Confirm the base-build information and boundaries between landlord provisions and tenant works before pricing.
Quotation & programme
Cost of interior fit-out in Dubai
Halo Works project budget range
AED 100,000 to under AED 300,000Shell condition, partitions, ceiling and service changes, joinery and the approval route affect both cost and timing.
Your proposal sets out inclusions, exclusions, payment milestones and programme assumptions. Tell us your target date so we can account for access, approvals and lead times.
Read the cost guideWhat a clear brief makes possible
Prepare the space for the way it will operate
Check the layout, customer or staff routes and building services together before packages are priced separately.
What to send us
Send the property location, photos or drawings, what you want to change and your target date. Include an indicative budget if you have one.
Prepare your briefWhat should I obtain from the landlord before fit-out?
Ask for available drawings, fit-out rules, service capacities and approval requirements. These help the appointed specialists confirm what can be delivered.
Who carries out the specialist work?
We appoint designers, engineers, manufacturers and contractors as required for the agreed work. Your proposal records who is responsible for each package.
What should I share for a quotation?
Share the property location, photos or drawings, your priorities and required completion date. An indicative budget helps us assess options.
Will my project need approval?
That depends on the property and the proposed work. We establish the requirements with the appointed specialists and agree who will submit the information.
What happens at handover?
We inspect the agreed work, record and follow up outstanding items, and compile the applicable test records, care information and warranty details.
Planning your project
Related guides
Commercial fit-outShell and core or already fitted? Compare the real cost
Two units with similar rent can need very different work. Here is what to ask for before choosing one.
Read guide
ApprovalsBefore the fit-out: understanding your approval route.
Four questions to settle early, so drawings, NOCs and inspections move with your programme rather than against it.
Read guide
Commercial fit-outCan you fit out an office while the team is still working?
Plan desks, IT cutovers, noisy work and temporary meeting space before agreeing to a phased office fit-out.
Read guideProject enquiries
Discuss your project.
Tell us what you want to change and when it needs to be ready. We’ll review your brief and discuss the next steps.
Chat on WhatsApp [email protected]